Jobsite inspections of several of
the builder's projects are completed to allow the Build-Rite team to become familiar with the construction cycle, from
the foundation to the roof sheathing.
-
A journal is completed with photos
for point of reference of the builder's preferences and challenges
for communication to the entire design team.
-
In-depth interviews are conducted
with members of the builder's staff, the architect, and the
structural engineer.
-
Interview process includes a
review of blueprints, scope of work, specifications, and
building codes for each set of plans.
-
Plans are input from builder's 2D
sheets into 3D modeling program.
-
Wall layout and framing
schematics
or panel drawings are developed
-
Floor layouts, roof trusses, and
framing are input until all elements of the structural frame have
been successfully modeled.
-
The structural frame is run through
the structure module of the program.
-
All load paths are VERIFIED.
-
Individual calculations for
beams, headers, engineered wood, trusses, and hangers are made
available to the engineer of record.
-
The Build-Rite process is not
intended to replace the architect or structural engineer. If
used in conjunction with both, it will reduce the hard costs
associated with home building.
-
After the collaborative process is
complete, a thorough review of all aspects of the structure's
rough frame design is conducted.
-
The Build-Rite team
coordinates the review of all
mechanicals, HVAC, electrical,
plumbing, etc. to verify proper placement.
-
The Build-Rite team
also coordinates the process for revising the working drawings to
reflect all construction-related
enhancements.
-
Every detail is catalogued. An
estimate savings is calculated. Build-Rite provides
the builder with a quantitative analysis.
-
Concise material lists are
developed.
-
Materials are precisely
calculated, sorted by construction phase, and cross-referenced
by application.
-
Material lists accompany framing
diagrams and schematics the clearly detail the material use
and its proper application.
-
Build-Rite assists in
identification and elimination of excessive deliveries and
costly pickups typically burdening material suppliers.
-
The Build-Rite process transforms
material estimating from a manual, best-guess process to one which
is precise and accounts for every piece of lumber and all building
materials required to build a specific structure.
-
Material flow and construction site
logistics are coordinated to eliminate unnecessary and redundant
costs.
-
The builder and all trade partners
share the cost savings.
-
The Build-Rite process is executed without disruption to the builder's daily
operation.
-
Build-Rite will
implement and monitor the revised construction process to ensure
full realization of project savings.
-
The Build-Rite team will return to the builder's selected job sites in 60 to
90 days to perform a thorough inspection.
-
The builder receives the
additional assurance of cost savings and process compliance.